Concrete Slab Floors for a New Home: What to Know Before the Pour

Plenty of new houses in Australia go on a concrete slab, and it does a lot of jobs at once. It’s your floor, it’s part of the structure and it’s part of the termite defence. It also gets poured once and then covered up, so if something’s wrong with it, you’re stuck with it. Knowing a bit before the pour means you can ask your builder and engineer better questions.

Everything here is drawn from the Australian Government’s Your Home guide to concrete slab floors, which is worth reading in full if you’ve got the time. Your own slab will come down to your site and your engineer though.

Types of slab, and your block

Your Home says slab on ground is the most common type. It’s poured straight onto the prepared site. Suspended slabs are poured on site too, but on formwork that’s either taken away afterwards or left in place. Precast slabs get made somewhere else and craned in. They can be conventional concrete, post tensioned concrete or autoclaved aerated concrete, and they’re normally designed by an engineer and then installed by builders or specialist subcontractors.

You’ll probably hear the term waffle pod slab as well. That’s a slab on ground built over a grid of foam pods, which are interconnected blocks of dense closed cell foam. Your Home calls it a cost effective type of slab. Whether it suits your block depends on the soil and your engineer’s design. If you do go that way, Your Home prefers pods made from XPS or PIR foam. It doesn’t recommend expanded polystyrene, because it breaks up easily on site and causes pollution.

The ground you’re building on has more say in all this than many people expect. Reactive soils can be hard to build on. On a steep block a slab on ground might not be practical at all, and another floor system could suit better. In cyclonic areas, a slab on ground also helps anchor the whole building down.

Earthworks come first and everything else sits on top of them. If your block needs cutting or filling, have a read of our guide to earthmoving and site preparation before anyone starts digging. And any digging comes with safety risks, so get across the basics of excavation safety too. Preparing the foundations properly is one of the main ways to keep cracking under control later on.

Pouring and curing

Concrete gets its strength slowly and needs looking after for the first few weeks. Your Home lists a few things that help a slab perform. The water content has to be right, because too much water causes cracking and weakens the slab. And the concrete is usually compacted by vibrating it as it goes in.

Curing matters as much as the pour itself. A curing membrane goes on for the first 3 to 7 days. Before any heavy loads go on, Your Home suggests giving it 28 days to reach design strength, or whatever period your structural engineer specifies. If your engineer gives you a different number, go with theirs. Rushing this bit to save a week can leave you with a weaker floor.

A structural engineer should always specify the final mix. Don’t skip that on a house. With the reinforcement designed and placed properly, and the concrete placed and compacted well, Your Home says a slab can have an almost unlimited lifespan. So it’s worth the fuss to get it right the first time.

Some risk of cracking comes with any concrete. Good foundation prep, compaction and curing all help keep it in check. And cracks aren’t just a looks thing, because they matter for termites too.

Termites

A slab only does its part of the termite defence if it’s built well. You need care during construction to stop cracking and termites getting in, and for minimum termite risk, slabs should be designed and built to Australian Standards. Where a brick cavity goes below ground, a sheet barrier can be used, like a polyethylene vapour barrier impregnated with termiticide, or a damp course, or both.

The slab edge is the bit you can check yourself. Leaving at least 100 mm of slab edge exposed above the ground or paving is a simple form of edge treatment. The trouble is that garden beds, paving and soil built up against the edge later can bury it. So when you’re planning the landscape design for your home, keep new beds and paths below that line.

Heat, insulation and noise

Concrete slabs have high thermal mass. Basically they soak up heat and let it go slowly, which can even out indoor temperatures. That’s useful in most climates and especially cool ones, but it only works properly when it’s combined with other passive design principles.

Insulation helps. Your Home says slabs should be insulated underneath in cold climates, and can be insulated on the edge in all climates. Edge insulation stops warmth leaking out the sides. In colder areas, insulation underneath keeps the slab apart from the cold ground.

What you put on top makes a difference as well. Polished concrete and tiles leave the thermal mass exposed. Carpet insulates the slab and you lose some of the benefit. If you’re tiling, stay away from rubber based adhesives, because they have an insulating effect too.

Slabs also suit long cycle slab heating, as long as the system is efficient. With hydronic systems, warm water runs through pipes set near the top of the concrete. Electric heating coils get attached to the reinforcement before the pour. Either way you have to decide early, because you can’t add it once the concrete’s down.

Will it be noisy? Airborne noise isn’t transmitted through a slab. Impact noise is another matter though, so footsteps and high heels on hard floors can carry to the room below. Think about that when you’re picking finishes for upstairs rooms.

Lower carbon mixes, and commercial floors

Conventional concrete has a lot of embodied energy. One way to cut its impact is to replace part of the cement with waste products called extenders, like fly ash, ground blast furnace slag and silica fume. Some blended cements are up to 85 per cent extenders.

Recycled aggregate is another option. A common approach is to use 30 per cent recycled aggregate in typical structural concrete, and Your Home says there’s no noticeable difference in workability or strength at that level. Ask your builder and engineer what their suppliers can do.

Most of this applies to warehouses, workshops and other commercial floors too. A slab that cracks or settles causes headaches for racking, forklifts and floor markings. Plan the layout before the pour so drains and services end up where you need them. Once the floor’s down, good warehouse line marking helps keep people and vehicles apart.

Before the pour, sit down with your builder and engineer and go over the soil, insulation, termite protection and the mix. Those conversations don’t cost much, and they’re a lot cheaper than finding a problem after the floor’s covered.